Recently, WPI reported on the Subcommittee on Commodity Exchanges, Energy, and Credit hearing about the timeline for the required volume obligations (RVOs) from EPA. We noted that Growth Energy, a biofuel trade association, informed EPA via a 2 November letter of its intent to file suit if EPA didn’t issue the RVO within 60 days of the letter. Since that update, EPA announced it would be delaying the compliance dates under the RFS, largely as a consequence of delayed RVO announcements past and present. As we reported in September, EPA previously extended the 2019 compliance deadline for small refineries (from 31 March 2020, to 30 November 2021) and the 2020 compliance deadline for all obligated parties (from 31 March 2021 to 31...
Like all marmots
An adult Vancouver Island marmot typically measures 65 to 70 centimetres (26 to 28 in) from the tip of its nose to the tip of its tail.
The Phoenix petrel (Pterodroma alba) is a medium-sized tropical seabird, measuring up to 35 cm (1.15 ft) long, with a wingspan of 83 cm (2.72 ft). It has a dark brown upperparts plumage, white below and whitish throat. The sexes are similar. The Phoenix petrel is found throughout oceans and coa...